FIRST FLOATING PROJECT AS CO-DEVELOPER

Buchan Offshore Wind (ScotWind)

960 MW Commercial-scale co-developed by BW Ideol, BayWa r.e. and Elicio


Buchan Offshore Wind is a commercial-scale floating offshore wind farm under development around 75 km north-east of Fraserburgh, off the Aberdeenshire coast of Scotland. With a capacity of around 960 MW, it is co-developed by BW Ideol alongside BayWa r.e. and Elicio, and has identified BW Ideol’s patented Damping Pool® as its preferred floating foundation. The consortium is targeting commissioning by the mid-2030s.  

CONTEXT AND TIMELINE OF THE TENDER

BW Ideol has participated in the "ScotWind" call for tenders launched by Crown Estate Scotland in 2020 alongside BayWa and Elicio as part of the consortium "Floating Energy Allyance", today known as "Buchan Offshore Wind". In support to the applications, two grid connections have been secured from National Grid ESO in July 2021.

On Monday 17 January 2022, Crown Estate Scotland announced the Floating Energy Allyance had secured the rights to develop a floating offshore wind farm of around 960 MW (announced at the time as approximately 1 GW) off the north-east coast of Scotland.

The ‘option agreement’ covers the area designated NE8 in the Scottish Government’s Sectoral Marine Plan for Offshore Wind, some 75 km north-east of Fraserburgh on the Aberdeenshire coast.

A PARTNERSHIP OF THREE LEADING EUROPEAN ENERGY BUSINESSES

BayWa r.e. is an international project developer that has brought online more than 6 GW of renewable energy worldwide. Active in the United Kingdom since 2011, BayWa r.e. has a development pipeline of over 3.3 GW of onshore wind, solar and battery storage projects across the UK and Ireland.

Elicio is an experienced Belgian offshore wind developer, owner and operator. It benefits from 20 years of experience in offshore wind, with a global portfolio of more than 2.3 GW, comprising 1.2 GW of floating projects under development in France and Scotland and over 1.1 GW of operational fixed-bottom offshore wind in the Belgian North Sea.

BW Ideol has an exclusivity agreement in place with the Ardersier Energy Transition Facility, the former oil and gas fabrication yard on the Moray Firth now operated by Haventus. The agreement secures BW Ideol long-term, exclusive access to the site, where the company is working towards establishing a new facility for the serial production of concrete floating foundations based on its proven Damping Pool® technology. Ardersier is the largest brownfield port in the United Kingdom, comprising around 400 acres of port area with a 2.2 km quay and 350 acres of statutory harbour authority, and has been identified as one of three East coast sites with the scale and location to become an Offshore Renewable Energy Hub Port.

BW IDEOL’S SCOPE OF WORK 

BW Ideol is a co-developer of Buchan Offshore Wind, holding a one-third equity stake alongside BayWa r.e. and Elicio. It also acts as the project’s floating foundation technology provider, under an engineering service agreement and a technology licence agreement signed in January 2022. The project has identified BW Ideol’s patented Damping Pool® as its preferred floating foundation and plans to install up to 70 concrete Damping Pool® substructures in waters up to 110 m deep, with a commitment to manufacturing them in Scotland. 

PROJECT MILESTONES  

2022: The consortium signs an Option Lease Agreement with Crown Estate Scotland, while BW Ideol secures engineering and technology licence agreements with the project.

2023: Buchan Offshore Wind submits its EIA Scoping Report and obtains a Scoping Opinion from the Marine Directorate.

August 2025: The offshore consent application is submitted to Scottish Ministers; a determination is anticipated later in 2026.

May 2026: Aberdeenshire Council grants Planning Permission in Principle for the onshore infrastructure, including the Rattray Head landfall and a 22 km buried cable route to a new substation at Peterhead.

Mid-2030s: Targeted commissioning, with more than £900 million of investment in Scotland and around 2,900 jobs at peak construction (figures published by Buchan Offshore Wind). 

PROJECT LAST NEWS

Planning consent for Buchan onshore infrastructure

Buchan Offshore Wind submit offshore consent applications 

Buchan Offshore Wind Awards New Contracts Worth More Than £1.5m

Work starts on Ardersier Port transformation

BW Ideol and Ardersier Port Authority have signed a strategic partnership agreement

Buchan Offshore Wind Website 

 

  • Capacity: 960 MW
  • Installation site: Scotland (NE8)
  • Water depth: 75 - 110 metres
  • Key role: Co-development of the project

This award underlines the pertinence of our co-development model and shows once again how BW Ideol’s unique value proposition contributes to a winning and differentiating bid.

Our partners

In BW Ideol they trust
BayWa
Elicio
Haventus

Our news

Corporate and projects updates

Illustrative Projection of a Concrete Floating Foundations Fabrication Line by BW Ideol in Ardesier ; credit BW Ideol

BW Ideol secures first public sector backing for its Ardersier floating foundation factory

Highlands and Islands Enterprise has approved more than £778,000 in Scottish Government funding to support the front-end engineering design study for BW Ideol's planned floating foundation manufacturing facility at the Port of Ardersier.

Read more

Fondation flottante Damping Pool® de BW Ideol sur le parc éolien en mer Eolmed - crédit BW Ideol

BW Ideol and NGE join forces in the Mediterranean

The two groups partner equally on Fos3F, BW Ideol's floating foundation factory project in France

Read more

BW Ideol concrete floating foundation production line at Ardersier (Scotland); credit: BW Ideol

Buchan offshore project secures onshore planning consent

Scottish floating offshore wind project Buchan, co-developed by BW Ideol, secures onshore planning consent

Read more